Powering The Future of Indonesia

Our journey is built on progress. Today, we continue to ensure energy security for Indonesia, powering industries, homes, and lives with an unwavering commitment. But this is just the beginning. As the world changes, we must evolve to meet new challenges — transitioning to cleaner energy, reducing carbon emissions, and investing in sustainable solutions. This is our commitment: to power a future where thriving green communities and clean industries are built on the foundation of responsibility.
History

Paiton Energy at A Glance

Established since 1994, PT Paiton Energy engaged in the field of power plant and currently owning as well as operating three coal-fired power plants at Paiton Power Complex in Probolinggo, East Java. We became the first and one of the largest Independent Power Producer (IPP) operating in Indonesia. We generate approximately 13,500 GWh of electricity per year which contribute to around 6% of the annual electricity consumption in Java Island.

PT Paiton Energy continues to strive and give the best in producing power and prioritizing sustainability as well as being responsible for the environment along the way of its process. We are continually making a limitless effort to be reliable, sustainable, professional, environmentally-friendly power producer that give the powerful energy to the country.

Our Commitment

Vision & Mission

Paiton Energy’s vision and mission drive us to provide reliable energy with a focus on sustainability and positive impact for Indonesia.

Our Vision

Our Mission

Three Powers Plants
Provide 2,045MW of Electricity

Business Profile

PT Paiton Energy cooperates with PT PLN (Persero) by providing 2,045MW of electricity or around 6% of the total installed capacity in Java.

 

Under a long-term Power Purchase Agreement, we own a reliable and sustainable power stations to deliver our power to the Indonesian society.

 

We continually strive to be a reputable electricity supplier, as well as being an active corporate citizen which support the local communities in East Java by providing other projects throughout Indonesia.

 

Therefore, our vision and missions could be realized through a long-term and strong capability to stream our source to the entire nation.

Our ultimate

Shareholders

are respected, high quality and experienced companies

Paiton

Technical Overview

Output

The total capacity of this power plant is 615 MW per unit, with two units operating simultaneously.

Commercial Operation Date

Unit 7 commenced commercial operation in May 1999, followed by Unit 8, which started in July of the same year.

Technology

The technology used is subcritical, which operates below the critical pressure of water, allowing for efficient steam generation.

Major Equipment Suppliers

Boiler

The boiler system was supplied by ABB-CE, now part of General Electric. It is responsible for converting water into high-pressure steam.

Steam Turbine

The steam turbine was provided by General Electric, converting steam energy into mechanical energy.

Generator

General Electric also supplied the generator, which converts mechanical energy from the steam turbine into electrical energy.

Main Transformer

Hitachi supplied the main transformer, which steps up the voltage for transmission through the power grid.

Seawater FGD

ABB-Flakt Hydro, part of General Electric, provided the Flue Gas Desulfurization (FGD) system, using seawater to reduce sulfur dioxide emissions from the coal combustion process.

Coal Handling Facilities

Mitsubishi Heavy Industries provided the coal handling facilities, responsible for transporting, storing, and processing the coal before it is burned in the boiler.

Output

Generates a capacity of 815MW to supply a reliable power source.

Commercial Operation Date

Officially began operations in March 2012, marking a milestone in energy production.

Technology

Utilizes subcritical technology for efficient power generation.

Major Equipment Suppliers

Boiler

Manufactured by Mitsubishi Heavy Industries, providing core heating technology.

Steam Turbine

Built by Mitsubishi Heavy Industries to drive the generation process.

Generator

Supplied by Mitsubishi Electric, converting mechanical energy to electricity.

Main Transformer

Engineered by Mitsubishi Electric to manage electricity distribution.

Seawater FGD

Mitsubishi Heavy Industries’ seawater FGD system for emission control.

Coal Handling Facilities

Designed by Mitsubishi Heavy Industries for efficient coal management.

Paiton Energy generates approximately 13,500 GWh of electricity per year, which contributes to around 6% of the annual electricity consumption in Java Island.